Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13600872

- Product Categories
- Friendly Links
Information Name: | Dongguan steel works, Peng Jian steel (certified), Zhuhai Steel |
Published: | 2014-12-30 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Prestressed reinforced steel construction process and steps prestressing steel reinforcement program can be divided into two types, one is directly attached to France, will anchor the ends and after prestressing by adhesive paste on the surface of steel structures; generally applicable to members relatively smooth surface of the rod, the component or partial reinforcement; the second is to adjust the beam as a prestressed cable stress, generally applies to the overall strengthening of the entire structure. 5.1 Selection: structure reinforced with carbon fiber for the main choice of PAN-based carbon fiber, the ultimate strength of up to 3500MPa, the elastic modulus of about 2.35 × 109MPa. Using epoxy resin system material. 5.2 Design: according to the mechanical characteristics of the structure to be repaired, the force transmission path and the stress - strain field, to determine the amount of fabric, size and laying direction. Fiber direction should be consistent with the maximum force trauma member orientation. If the lesion is in the complex stress state, the fiber orientation and stacking sequence should be consistent with the control of the main stress direction. 5.3 Embedded Prestressed tensioning: steel reinforcement particularity prestressing need a simple way, the traditional way of prestressing is often the first post-tensioned anchorage steel company, requires a relatively complex tensioning equipment , and the corresponding reaction force means. When the anchor, prestressing loss is relatively large. Prestressed tension embedded technology, which is characterized by the first post-tensioning anchor to members and former anchor itself as a steel tensioning force device without complicated tensioning equipment. Prestressed tension applied to the embedded technology can be divided into sub-prestressed, can produce an adhesive layer extrusion effect, improving the reliability of the paste. Meanwhile, due to the use after the first anchor tensioning technology, small prestressing loss, the method is simple and effective. Steel hypothetical question hypothetical restraint should note: In order to reduce steel welding deformation. Welds should be as symmetrical arrangement; not arbitrarily increase the weld thickness; the premise of ensuring safety of welds should not be too concentrated. Construction Control and Prevention. Prefabricated moral restraint, not segmented measurement; after the release of the steel wire size should be the amount of the full-length sub dimensions. Save the cumulative size. For members require a higher dimension, should put the line marked like red eyes. To ensure that the cutting edge of the cutting quality, 12mm below the board should try to mechanical cutting. When cutting with gas welding steel, steel specifications should be considered to extend the margin 2-3mm aside. Should be corrected; deformed steel beyond designated tolerance range. If the allowable value for the scale delineation of cold deformation correction and cold bending radius of curvature of the minimum and maximum bending vectors should be used to correct or use steel pressure jack homemade correct tools to perform cold correction, incident corrections. Style pattern shown in execution; or if the deformation of a steel member of a larger, -6 SU 1.210-5 / ℃ elongation coefficient of linear expansion in all directions, due to the high temperature heating zone, the heating zone of the steel shrinkage steel building structure, while the temperature is low near the heating zone, which restricts the expansion of the heating zone to the surrounding, so that the metal of the heating zone is squeezed, when the heating temperature must be reached, the heating zone the metal due to compression plastic deformation light steel prices, changing the crystal structure of the heating zone the metal occurs. Upon cooling to the original temperature, in addition to the length of the contraction before heating, but also to extend the rate of 1.4810-6 / ℃ of further contraction, and therefore extend the length after the previous heating has been shortened. Dongguan steel works, Peng Jian steel (certified), Zhuhai, Dongguan City, the steel structure is provided by Peng Jian Steel Limited. Steel Co., Ltd., Dongguan City, Peng Jian (dgpengjian.cn) is Dongguan, steel leader, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. Peng leader in steel construction with the staff warmly welcome all inquiries negotiations to create Peng build a better future for steel. |
Admin>>>
You are the 11199 visitor
Copyright © GuangDong ICP No. 10089450, Steel Co., Ltd., Dongguan City, Peng Jian All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 11199 visitor
Copyright © GuangDong ICP No. 10089450, Steel Co., Ltd., Dongguan City, Peng Jian All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility