Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13600872

- Product Categories
- Friendly Links
Information Name: | Steel structure design, Shanghai steel, Peng Jian Steel (View) |
Published: | 2014-11-07 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Steel structure design, Shanghai steel, Peng Jian Steel (view) Ltd., Dongguan City, Peng was built by steel. Steel Co., Ltd., Dongguan City, Peng Jian (dgpengjian.cn) Guangdong Dongguan, steel leader, over the years, the company is implementing scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. Peng leader in steel construction with the staff warmly welcome all inquiries negotiations to create Peng Jian Steel a better future. Steel structures attic should find the best professional before making a few points to note about the loft attic loft designed steel structure design. Construction to determine the level a little, lay horizontal steel production, Click construction. Steel material used to determine the attic, (span of more than 3.5 meters. Preferably with GB steel). Some do not recommend owners of professional attic with square steel companies do not desirable, (inside and outside the party can not fully rust-proof steel. Easily oxidized, relatively thin thickness) should correct channel or I-beam. If the steel improper selection, after the completion of the attic will flutter overall steel plant drawings, white will crack. Construction to determine the level a little, lay horizontal steel, press construction. As the walls are hollow bricks, the best overall channel lying in the wall 10 cm, both sides must be added to the column. Attic steel channel. Angle laying most plus size is 610mm * 610mm, according to Blockboard 1.22 m * 2.44 m given. Otherwise it will waste a lot of the board. Channel and angle welding must be in a plane. In the channel bottom welding, when the board will put the burden of not real, after soldering is absolutely necessary level. Cutting groove angle method is best to use plug sockets, flat, vertical-sided welded steel construction, rust is also very important, just the structure of the package on the inside to absorb moisture easily, San Chao difficult (especially the attic above the bathroom). Best to make a change before making steel rust rust treatment after a good brush, must take the doors and windows open to keep the ventilation, the toxin paints exhausted Dongguan steel awning awning installation of the safety measures necessary for equipment installation and construction of steel structures test methods. First, we want to tool (Power Tools) to install the required strict insulation test. For some machines (for example: sucker machine) adsorption time of testing and trial; for construction workers were supporting the protective measures to prevent casualties. In using some sealing material when required to do anti-virus work, for some solution to isolate and moisture-proof, anti-exposure work. In fact, the installation of steel awning main difficulty lies in Anchorage, close to the beach for some projects, it must be wind, moisture resistance characteristics, that is, to reinforce the technical, process, there are bars and orderly reasonable construction help maximize the effect of the installation. |
Admin>>>
You are the 11199 visitor
Copyright © GuangDong ICP No. 10089450, Steel Co., Ltd., Dongguan City, Peng Jian All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 11199 visitor
Copyright © GuangDong ICP No. 10089450, Steel Co., Ltd., Dongguan City, Peng Jian All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility